JCEE RESEARCH

Research programs

Follow the questions, recorded outcomes, and next qualifying gates.

CURRENT PRIORITY / OCTOBER 19, 2026

Qualify one connected assurance path.

The immediate engineering priority is to connect the components and establish which guarantees survive when evidence changes, permission is revoked, replies disappear, and recovery resumes. The latest software candidate has passed its bounded combined qualification and entered working integration with the reviewed source tree preserved.

The retained result covers a controlled fictional ledger and a declared protected-checkpoint restore model. Independent human review, production admission, and E003 physical commitment remain separate gates. The broader research portfolio below is a dated map of the questions we study, not a claim that every field is actively qualified.

Research programs and recorded outcomes

Completed gates, negative results, and open evaluations all remain part of the record.

BROAD CLAIM RETIRED · NARROW RESIDUAL

CRUCIBLE P0.3

Both lanes met the tested safety criteria. Four burden axes tied; integration touchpoints were 3 versus 5. The terminal result retired the broad composition-compression claim. The recorded Python 3.10/3.12 CI reproduction passed.

Synthetic, same-author research. No general advantage, independent-team verification, customer economics, or production-safety result.

Full record →

BOUNDED RESULT PRESERVED · CI BLOCKED

AUTOGRAPHY P0.7

The frozen result is KNOWN / PASS_BOUNDED with zero novel primitives. The preserved source archive is authoritative for that result.

The historical repository archive is malformed; no green P0.7 CI or P0.8 result is claimed.

Full record →

SYNTHETIC INTEGRATION MILESTONE

LEM / ESL

The preserved synthetic week reports 13/13 checks across connected learning components.

No educational-efficacy, learner-proficiency, or production-launch result.

Full record →

HARNESS CONFORMANCE · MODEL RESULT PENDING

LAM P0.1

Three reference cases cover normal operation, read failure, and prompt-injection containment.

A functioning harness does not establish live model behavior.

Full record →

R4 OVERALL FAIL · R6 CHECKPOINT

VELA

R4 was a valid study with a narrow supported effect, but missed all three absolute capability thresholds.

No production retrieval capability. The R6 primary execution remains locked pending its named prerequisites.

Full record →

FROZEN MATHEMATICAL MILESTONE

TOT 0.3R1

The frozen T1–T13 core has been recovered.

Later 0.4 acceptance still requires exact evidence backfill. No physical correspondence or automatic runtime capability.

Full record →

CONDITIONAL PASS · PHYSICAL BRIDGE NO-GO

RTL-SR P0.8

A conditional result holds in the declared continuum class.

Abstract-graph locality and the physical bridge remain NO_GO. No independently derived physical geometry or empirical clock law.

Full record →

FEASIBILITY STUDIED · FULL STACK NOT READY

GMDA P0.3–P0.5

P0.3 identified a source-modulation path; P0.4 identified an institutional path while recording incomplete sensor-stack maturity.

P0.5 qualification is preregistered, not run. No partner access, outreach result, physical campaign, or new-physics result.

Full record →

Reproduction and review

A result becomes more useful when someone else can examine it.

Bring a research question, a reproduction proposal, or a specific claim you want to evaluate. We can discuss the appropriate evidence and review boundary.

Discuss research →